2 x 1 MW Containerised
This project was for 2 x 1MW containerised units to provide power to a bulk tanker vessel whilst in dry dock, for a refit. This contract required the 2 units to loadshare along with bulk fuel tanks and 100m cable runs.

This project was for 2 x 1MW containerised units to provide power to a bulk tanker vessel whilst in dry dock, for a refit. This contract required the 2 units to loadshare along with bulk fuel tanks and 100m cable runs.
We have placed cookies on your device to help make this website better.
I'm fine with thisWe have placed cookies on your device to help make this website better.
You can use this tool to change your cookie settings. Otherwise, we’ll assume you’re OK to continue.